ITAC Assessment: UD0408
ITAC logo
ITAC Assessment: UD0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product organic chemicals
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 148,000
ft2
Annual Production 55,000,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,321 2,037,222
kWh
Natural Gas $85,513 17,899
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,023 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings
01 2.3522: Increase electrical conductor size to reduce distribution losses $2,008 $1,500 $2,008
-
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,052 $21,676 $8,052
116,061
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,726 - $1,726
20,223
kWh
- -
04 2.2444: Use hot process fluids to preheat incoming process fluids $13,391 $10,000 - $10,415
-
MMBtu
$2,976
-
MMBtu
05 2.7261: Install timers and/or thermostats $6,067 $3,000 $281
13,189
kWh
$5,786
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $1,779 $4,000 - $1,779
-
MMBtu
-
TOTAL RECOMMENDED $33,023 $40,176 $12,067
149,473
kWh
$17,980
-
MMBtu
$2,976
-
MMBtu
TOTAL IMPLEMENTED $31,244 $36,176 $12,067
149,473
kWh
$16,201
-
MMBtu
$2,976
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs