| Assessment Year | 1993 |
|---|---|
| Principal Product | organic chemicals |
| NAICS |
n/a
|
| SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
148,000
ft2
|
| Annual Production | 55,000,000
lb
|
| Production Hrs. Annual | 5,200
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $123,321 | 2,037,222 |
kWh
|
$0.061 |
| Natural Gas | $85,513 | 17,899 |
MMBtu
|
$4.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $33,023 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $31,244 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3522: Increase electrical conductor size to reduce distribution losses | $2,008 | $1,500 |
$2,008
-
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,052 | $21,676 |
$8,052
116,061
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,726 | - |
$1,726
20,223
kWh
|
- | - | |
| 04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $13,391 | $10,000 | - |
$10,415
-
MMBtu
|
$2,976
-
MMBtu
|
|
| 05 | 2.7261: Install timers and/or thermostats | $6,067 | $3,000 |
$281
13,189
kWh
|
$5,786
-
MMBtu
|
- | |
| 06 | 2.2437: Recover waste heat from equipment | $1,779 | $4,000 | - |
$1,779
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $33,023 | $40,176 |
$12,067
149,473
kWh
|
$17,980
-
MMBtu
|
$2,976
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $31,244 | $36,176 |
$12,067
149,473
kWh
|
$16,201
-
MMBtu
|
$2,976
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs