ITAC Assessment: UD0407
ITAC logo
ITAC Assessment: UD0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product metal job shop
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 45,000
ft2
Annual Production 475,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,355 2,359,320
kWh
Natural Gas $16,369 3,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3522: Increase electrical conductor size to reduce distribution losses $2,303 $6,000 $2,303
-
kWh
-
02 2.3191: Use demand controller or load shedder $4,300 $1,000 $4,300
-
kWh
-
03 2.3191: Use demand controller or load shedder $1,563 $500 $1,563
-
kWh
-
04 2.7132: Install timers on light switches in little used areas $2,346 $1,500 $2,733
70,047
kWh
$(-387.0)
-
MMBtu
TOTAL RECOMMENDED $10,512 $9,000 $10,899
70,047
kWh
$(-387.0)
-
MMBtu
TOTAL IMPLEMENTED $10,512 $9,000 $10,899
70,047
kWh
$(-387.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs