| Assessment Year | 1993 |
|---|---|
| Principal Product | aluminum and zinc castings |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
72,000
ft2
|
| Annual Production | 1,150
ton
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $127,275 | 2,300,410 |
kWh
|
$0.055 |
| Natural Gas | $74,869 | 16,817 |
MMBtu
|
$4.45 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,664 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,664 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2424: Use heat in flue gases to preheat products or materials | $17,544 | $50,000 | - |
$17,544
-
MMBtu
|
|
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $5,715 | $25,000 |
$14,801
261,137
kWh
|
$(-9,086.0)
-
MMBtu
|
|
| 03 | 2.7141: Lower light fixtures in high ceiling areas | $1,873 | $202 |
$1,873
39,859
kWh
|
- | |
| 04 | 2.7132: Install timers on light switches in little used areas | $532 | $250 |
$532
11,430
kWh
|
- | |
| TOTAL RECOMMENDED | $25,664 | $75,452 |
$17,206
312,426
kWh
|
$8,458
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $25,664 | $75,452 |
$17,206
312,426
kWh
|
$8,458
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs