| Assessment Year | 1987 |
|---|---|
| Principal Product | HEAT EXCHANGERS & DRUMS |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $5 M to 10M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 12,000,000
lb
|
| Production Hrs. Annual | 2,704
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $115,931 | 1,213,951 |
kWh
|
$0.095 |
| Natural Gas | $21,379 | 4,029 |
MMBtu
|
$5.31 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,140 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,066 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $616 | $644 |
$616
6,448
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,314 | $3,240 |
$2,314
24,326
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,760 | $400 | - |
$1,760
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $160 | $500 | - |
$160
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,290 | $450 |
$8,290
87,925
kWh
|
- | |
| TOTAL RECOMMENDED | $13,140 | $5,234 |
$11,220
118,699
kWh
|
$1,920
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,066 | $1,594 |
$8,906
94,373
kWh
|
$160
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs