ITAC Assessment: GT0328
ITAC logo
ITAC Assessment: GT0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product HEAT EXCHANGERS & DRUMS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 12,000,000
lb
Production Hrs. Annual 2,704
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,931 1,213,951
kWh
Natural Gas $21,379 4,029
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $616 $644 $616
6,448
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,314 $3,240 $2,314
24,326
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,760 $400 - $1,760
-
MMBtu
04 2.2511: Insulate bare equipment $160 $500 - $160
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,290 $450 $8,290
87,925
kWh
-
TOTAL RECOMMENDED $13,140 $5,234 $11,220
118,699
kWh
$1,920
-
MMBtu
TOTAL IMPLEMENTED $9,066 $1,594 $8,906
94,373
kWh
$160
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs