ITAC Assessment: UD0392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product plastic containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 101
Plant Area 40,000
ft2
Annual Production 190,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $490,555 9,781,653
kWh
Natural Gas $8,185 1,839
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,129 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,217

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $26,912 $34,000 $26,912
599,941
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $12,218 - $12,218
262,603
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,501 $54,400 $30,546
656,213
kWh
$(-6,045.0)
-
MMBtu
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,274 - $2,274
-
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $3,755 $1,000 $4,335
96,717
kWh
$(-580.0)
-
MMBtu
06 2.7111: Reduce illumination to minimum necessary levels $9,469 $630 $10,931
243,552
kWh
$(-1,462.0)
-
MMBtu
TOTAL RECOMMENDED $79,129 $90,030 $87,216
1,859,026
kWh
$(-8,087.0)
-
MMBtu
TOTAL IMPLEMENTED $52,217 $56,030 $60,304
1,259,085
kWh
$(-8,087.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs