ITAC Assessment: UD0385
ITAC logo
ITAC Assessment: UD0385
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product METAL SHELVING
NAICS
n/a
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,005 2,545,428
kWh
Natural Gas $132,318 32,289
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,575 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $38,747 $60,000 - $38,747
-
MMBtu
02 2.3511: Use plant owned transformers or lease transformers $6,576 $18,000 $6,576
-
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,703 - $2,703
-
kWh
-
04 2.2437: Recover waste heat from equipment $4,026 $3,294 - $4,026
-
MMBtu
05 2.2424: Use heat in flue gases to preheat products or materials $12,716 $3,428 - $12,716
-
MMBtu
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,807 $2,200 $1,453
67,995
kWh
$1,354
-
MMBtu
TOTAL RECOMMENDED $67,575 $86,922 $10,732
67,995
kWh
$56,843
-
MMBtu
TOTAL IMPLEMENTED $60,999 $68,922 $4,156
67,995
kWh
$56,843
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs