ITAC Assessment: UD0372
ITAC logo
ITAC Assessment: UD0372
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC SHEET EXTRUSION
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 25,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $296,746 6,186,694
kWh
Natural Gas $13,358 3,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,610 - $7,610
-
kWh
02 2.6212: Turn off equipment during breaks, reduce operating time $17,103 $841 $17,103
384,232
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $305 $6,008 $305
6,741
kWh
TOTAL RECOMMENDED $25,018 $6,849 $25,018
390,973
kWh
TOTAL IMPLEMENTED $7,915 $6,008 $7,915
6,741
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs