ITAC Assessment: UD0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product DRESSES
NAICS
n/a
SIC 2361: Girls', Children's, and Infants' Dresses, Blouses, and Shirts
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 2,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,000 1,000,000
kWh
Natural Gas $36,000 9,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,004 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,004

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $1,200 - $1,200
-
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $582 $500 $582
7,327
kWh
-
03 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $2,078 - $2,505
34,877
kWh
$(-427.0)
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,144 $532 $1,144
25,498
kWh
-
TOTAL RECOMMENDED $5,004 $1,032 $5,431
67,702
kWh
$(-427.0)
-
MMBtu
TOTAL IMPLEMENTED $5,004 $1,032 $5,431
67,702
kWh
$(-427.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs