ITAC Assessment: UD0359
ITAC logo
ITAC Assessment: UD0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ACRYLIC SHEETS
NAICS
n/a
SIC 2824: Manmade Organic Fibers, Except Cellulosic
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 8,500
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $585,083 13,987,105
kWh
Natural Gas $216,913 79,623
MMBtu
Fuel Oil #6 $96,825 40,344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,096 - $12,096
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,528 - $3,528
-
kWh
-
03 2.2441: Preheat boiler makeup water with waste process heat $10,541 $10,000 - $10,541
-
MMBtu
TOTAL RECOMMENDED $26,165 $10,000 $15,624
-
kWh
$10,541
-
MMBtu
TOTAL IMPLEMENTED $26,165 $10,000 $15,624
-
kWh
$10,541
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs