ITAC Assessment: UD0349
ITAC logo
ITAC Assessment: UD0349
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product INJECTION MOLDED BATTERY
NAICS
n/a
SIC 3691: Storage Batteries
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 14,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,024,906 25,045,428
kWh
Natural Gas $34,587 6,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,836

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $3,744 $2,000 $3,744
-
kWh
-
02 2.2491: Use cooling air which cools hot work pieces for space heating $2,075 $3,000 - $2,075
-
MMBtu
03 2.2491: Use cooling air which cools hot work pieces for space heating $14,880 $24,000 - $14,880
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $26,582 $22,000 $26,582
611,079
kWh
-
05 2.2511: Insulate bare equipment $21,341 $5,000 $21,341
519,637
kWh
-
06 2.2511: Insulate bare equipment $34,214 $17,000 $34,214
833,529
kWh
-
TOTAL RECOMMENDED $102,836 $73,000 $85,881
1,964,245
kWh
$16,955
-
MMBtu
TOTAL IMPLEMENTED $102,836 $73,000 $85,881
1,964,245
kWh
$16,955
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs