ITAC Assessment: UD0346
ITAC logo
ITAC Assessment: UD0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product LAMINATED TUBS
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area
n/a
Annual Production 166,000,000
pieces
Production Hrs. Annual 8,500
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,148 5,915,006
kWh
Natural Gas $11,224 2,271
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,116 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,116

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $7,193 $5,000 $7,193
-
kWh
-
02 2.6218: Turn off equipment when not in use $7,995 - $7,995
174,091
kWh
-
03 2.4131: Size electric motors for peak operating efficiency $2,769 - $2,769
13,775
kWh
-
04 2.2437: Recover waste heat from equipment $5,106 $5,000 - $5,106
-
MMBtu
05 2.7111: Reduce illumination to minimum necessary levels $2,053 - $2,053
47,186
kWh
-
TOTAL RECOMMENDED $25,116 $10,000 $20,010
235,052
kWh
$5,106
-
MMBtu
TOTAL IMPLEMENTED $25,116 $10,000 $20,010
235,052
kWh
$5,106
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs