Assessment Year | 1991 |
---|---|
Principal Product | PLASTIC EXTRUSIONS |
NAICS |
n/a
|
SIC | 3083: Laminated Plastics Plate, Sheet, and Profile Shapes |
Sales Range | $10 M to 50M |
# of Employees | 96 |
Plant Area |
n/a
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 8,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $270,910 | 6,913,834 |
kWh
|
$0.039 |
Natural Gas | $15,090 | 3,697 |
MMBtu
|
$4.08 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,402 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,402 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,567 | - |
$7,567
-
kWh
|
- | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $4,627 | $4,000 |
$4,627
37,808
kWh
|
- | |
03 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $5,208 | - |
$4,748
122,509
kWh
|
$460 | |
TOTAL RECOMMENDED | $17,402 | $4,000 |
$16,942
160,317
kWh
|
$460 | ||
TOTAL IMPLEMENTED | $17,402 | $4,000 |
$16,942
160,317
kWh
|
$460 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs