ITAC Assessment: UD0332
ITAC logo
ITAC Assessment: UD0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SHEET METAL FABRICATION
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 43
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,750
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,196 676,729
kWh
Natural Gas $27,520 6,490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,012

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $741 $624 $741
5,275
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,333 - $1,333
-
kWh
- -
03 2.4322: Use or replace with energy efficient substitutes $3,459 - $1,639
21,981
kWh
$420
-
MMBtu
$1,400
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,479 - $6,829
91,735
kWh
$(-626.0)
-
MMBtu
$276
TOTAL RECOMMENDED $12,012 $624 $10,542
118,991
kWh
$(-206.0)
-
MMBtu
$1,676
TOTAL IMPLEMENTED $12,012 $624 $10,542
118,991
kWh
$(-206.0)
-
MMBtu
$1,676
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs