ITAC Assessment: UD0331
ITAC logo
ITAC Assessment: UD0331
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CONTAINERS
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area
n/a
Annual Production 125,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,572 4,279,601
kWh
Natural Gas $74,716 17,850
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,493 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,554 - $2,800
65,064
kWh
$(-464.0)
-
MMBtu
$218
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,853 - $3,168
73,564
kWh
$(-525.0)
-
MMBtu
$210
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,774 - $11,979
278,722
kWh
$(-1,987.0)
-
MMBtu
$782
04 2.4239: Eliminate or reduce compressed air usage $14,828 $500 $9,030
209,848
kWh
$1,498
-
MMBtu
$4,300
05 3.4115: Recover and reuse cooling water $1,484 - - - $1,484
TOTAL RECOMMENDED $32,493 $500 $26,977
627,198
kWh
$(-1,478.0)
-
MMBtu
$6,994
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs