Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product TRANSMISSION DIE CASTS
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 30
pieces
Production Hrs. Annual 7,500
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,366 3,429,074
kWh
Natural Gas $28,658 5,727
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,372

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,550 $3,000 $2,311
58,910
kWh
$239
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,372 - $2,372
-
kWh
- -
03 2.3134: Shift from daytime to nighttime operation $3,745 - $4,745
-
kWh
- $(-1,000.0)
TOTAL RECOMMENDED $8,667 $3,000 $9,428
58,910
kWh
$239
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $2,372 - $2,372
-
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs