| Assessment Year | 1990 |
|---|---|
| Principal Product | COMMERCIAL PRINTING |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $1 M to 5M |
| # of Employees | 76 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $22,782 | 303,048 |
kWh
|
$0.075 |
| Natural Gas | $121 | 16 |
MMBtu
|
$7.56 |
| Other Energy | $12,083 | 1,072 |
MMBtu
|
$11.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,086 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,826 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7233: Use properly designed and sized hvac equipment | $5,744 | $20,000 | - |
$(-6,339.0)
-
MMBtu
|
$12,083
-
MMBtu
|
- | |
| 02 | 2.4322: Use or replace with energy efficient substitutes | $706 | $700 |
$963
12,896
kWh
|
$(-257.0)
-
MMBtu
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $260 | $240 |
$191
2,931
kWh
|
- | - | $69 | |
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $2,376 | $25,000 | - |
$2,376
-
MMBtu
|
- | - | |
| TOTAL RECOMMENDED | $9,086 | $45,940 |
$1,154
15,827
kWh
|
$(-4,220.0)
-
MMBtu
|
$12,083
-
MMBtu
|
$69 | ||
| TOTAL IMPLEMENTED | $8,826 | $45,700 |
$963
12,896
kWh
|
$(-4,220.0)
-
MMBtu
|
$12,083
-
MMBtu
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs