ITAC Assessment: UD0313
ITAC logo
ITAC Assessment: UD0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COMMERCIAL PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 76
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,782 303,048
kWh
Natural Gas $121 16
MMBtu
Other Energy $12,083 1,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,086 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,826

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings
01 2.7233: Use properly designed and sized hvac equipment $5,744 $20,000 - $(-6,339.0)
-
MMBtu
$12,083
-
MMBtu
-
02 2.4322: Use or replace with energy efficient substitutes $706 $700 $963
12,896
kWh
$(-257.0)
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $260 $240 $191
2,931
kWh
- - $69
04 2.7492: Use proper thickness of insulation on building envelope $2,376 $25,000 - $2,376
-
MMBtu
- -
TOTAL RECOMMENDED $9,086 $45,940 $1,154
15,827
kWh
$(-4,220.0)
-
MMBtu
$12,083
-
MMBtu
$69
TOTAL IMPLEMENTED $8,826 $45,700 $963
12,896
kWh
$(-4,220.0)
-
MMBtu
$12,083
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs