ITAC Assessment: UD0311
ITAC logo
ITAC Assessment: UD0311
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product COMMERCIAL PRINTING
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,549 3,161,196
kWh
Natural Gas $33,601 7,554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,733 $2,400 $11,369
288,101
kWh
$(-5,636.0)
-
MMBtu
02 2.2122: Install / repair insulation on condensate lines $678 $250 $237
10,551
kWh
$441
-
MMBtu
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $549 - $158
7,034
kWh
$391
-
MMBtu
04 2.8114: Change rate schedules or other changes in utility service $2,107 $6,000 $2,107
-
kWh
-
TOTAL RECOMMENDED $9,067 $8,650 $13,871
305,686
kWh
$(-4,804.0)
-
MMBtu
TOTAL IMPLEMENTED $6,282 $2,400 $11,527
295,135
kWh
$(-5,245.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs