Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ENVELOPES
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 625,000
pieces
Production Hrs. Annual 6,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,787 2,757,327
kWh
Natural Gas $42,643 9,914
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4235: Remove or close off unneeded compressed air lines $1,230 - $980
43,083
kWh
- $250
02 2.7494: Install storm windows and doors $8,782 $8,000 - $8,782
-
MMBtu
-
03 2.3191: Use demand controller or load shedder $1,494 $1,500 $1,494
-
kWh
- -
04 2.2437: Recover waste heat from equipment $2,214 $1,500 - $2,214
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $874 - $1,594
-
kWh
- $(-720.0)
TOTAL RECOMMENDED $14,594 $11,000 $4,068
43,083
kWh
$10,996
-
MMBtu
$(-470.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs