ITAC Assessment: UD0301
ITAC logo
ITAC Assessment: UD0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ELECT. WIRE ROPE HEISTS
NAICS
n/a
SIC 3536: Overhead Traveling Cranes, Hoists, and Monorail Systems
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 1,400
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,916 2,038,980
kWh
Natural Gas $50,400 14,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,313 - $2,313
-
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,236 - $9,636
-
kWh
- $(-400.0)
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,636 - $9,636
-
kWh
- $(-1,000.0)
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,480 - $8,480
-
kWh
- $(-1,000.0)
05 2.6232: Install set-back timers $1,252 - $1,448
66,237
kWh
$(-508.0)
-
MMBtu
$312
06 2.7111: Reduce illumination to minimum necessary levels $1,399 - $1,535
15,533
kWh
$(-136.0)
-
MMBtu
-
07 2.7492: Use proper thickness of insulation on building envelope $1,574 $5,000 - $1,574
-
MMBtu
-
08 2.7492: Use proper thickness of insulation on building envelope $1,095 $7,500 - $1,095
-
MMBtu
-
TOTAL RECOMMENDED $32,985 $12,500 $33,048
81,770
kWh
$2,025
-
MMBtu
$(-2,088.0)
TOTAL IMPLEMENTED $5,320 $12,500 $2,983
81,770
kWh
$2,025
-
MMBtu
$312
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs