| Assessment Year | 1989 |
|---|---|
| Principal Product | SHEET METAL STAMPING DIE |
| NAICS |
n/a
|
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $5 M to 10M |
| # of Employees | 76 |
| Plant Area |
n/a
|
| Annual Production | 100
pieces
|
| Production Hrs. Annual | 5,300
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,110 | 961,020 |
kWh
|
$0.064 |
| Natural Gas | $8,094 | 1,866 |
MMBtu
|
$4.34 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,417 | - |
$1,667
-
kWh
|
- | $(-250.0) | |
| 02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $1,480 | $1,450 |
$1,480
56,565
kWh
|
- | - | |
| 03 | 2.7226: Use computer programs to optimize hvac performance | $1,900 | $300 |
$1,900
-
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,238 | $4,400 |
$1,531
29,601
kWh
|
$(-319.0)
-
MMBtu
|
$26 | |
| TOTAL RECOMMENDED | $6,035 | $6,150 |
$6,578
86,166
kWh
|
$(-319.0)
-
MMBtu
|
$(-224.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs