ITAC Assessment: UD0295
ITAC logo
ITAC Assessment: UD0295
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SHEET METAL STAMPING DIE
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 76
Plant Area
n/a
Annual Production 100
pieces
Production Hrs. Annual 5,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,110 961,020
kWh
Natural Gas $8,094 1,866
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,417 - $1,667
-
kWh
- $(-250.0)
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,480 $1,450 $1,480
56,565
kWh
- -
03 2.7226: Use computer programs to optimize hvac performance $1,900 $300 $1,900
-
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,238 $4,400 $1,531
29,601
kWh
$(-319.0)
-
MMBtu
$26
TOTAL RECOMMENDED $6,035 $6,150 $6,578
86,166
kWh
$(-319.0)
-
MMBtu
$(-224.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs