ITAC Assessment: UD0294
ITAC logo
ITAC Assessment: UD0294
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CUSTOM MADE MACHINES
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area
n/a
Annual Production 70
pieces
Production Hrs. Annual 4,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,357 549,824
kWh
Natural Gas $3,163 703
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,961 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $464

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $464 - $464
19,050
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,945 $693 $2,212
39,859
kWh
$(-409.0)
-
MMBtu
$142
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,552 - $1,685
30,481
kWh
$(-311.0)
-
MMBtu
$178
TOTAL RECOMMENDED $3,961 $693 $4,361
89,390
kWh
$(-720.0)
-
MMBtu
$320
TOTAL IMPLEMENTED $464 - $464
19,050
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs