Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product CNC GEAR ANALYZER
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area
n/a
Annual Production 18
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,192 1,403,576
kWh
Natural Gas $6,426 1,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,133 - $2,333
-
kWh
- $(-200.0)
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $776 - $776
31,946
kWh
- -
03 2.2437: Recover waste heat from equipment $725 $1,000 - $725
-
MMBtu
-
04 2.7111: Reduce illumination to minimum necessary levels $498 $39 $470
6,741
kWh
- $28
05 2.2437: Recover waste heat from equipment $287 - - $287
-
MMBtu
-
TOTAL RECOMMENDED $4,419 $1,039 $3,579
38,687
kWh
$1,012
-
MMBtu
$(-172.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs