ITAC Assessment: UD0280
ITAC logo
ITAC Assessment: UD0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product METAL PLATING
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $277,926 4,966,002
kWh
Natural Gas $168,413 44,430
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,396

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7492: Use proper thickness of insulation on building envelope $14,040 $14,400 - $14,040
-
MMBtu
-
02 2.4239: Eliminate or reduce compressed air usage $3,566 $7,000 $3,566
98,769
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,696 - $18,568
-
kWh
- $(-1,872.0)
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,314 - $4,314
-
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $825 - $713
19,050
kWh
$(-118.0)
-
MMBtu
$230
06 2.7494: Install storm windows and doors $955 $1,920 - $955
-
MMBtu
-
TOTAL RECOMMENDED $40,396 $23,320 $27,161
117,819
kWh
$14,877
-
MMBtu
$(-1,642.0)
TOTAL IMPLEMENTED $40,396 $23,320 $27,161
117,819
kWh
$14,877
-
MMBtu
$(-1,642.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs