Assessment Year | 1989 |
---|---|
Principal Product | METAL PLATING |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 110 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $277,926 | 4,966,002 |
kWh
|
$0.056 |
Natural Gas | $168,413 | 44,430 |
MMBtu
|
$3.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,396 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $40,396 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7492: Use proper thickness of insulation on building envelope | $14,040 | $14,400 | - |
$14,040
-
MMBtu
|
- | |
02 | 2.4239: Eliminate or reduce compressed air usage | $3,566 | $7,000 |
$3,566
98,769
kWh
|
- | - | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $16,696 | - |
$18,568
-
kWh
|
- | $(-1,872.0) | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,314 | - |
$4,314
-
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $825 | - |
$713
19,050
kWh
|
$(-118.0)
-
MMBtu
|
$230 | |
06 | 2.7494: Install storm windows and doors | $955 | $1,920 | - |
$955
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $40,396 | $23,320 |
$27,161
117,819
kWh
|
$14,877
-
MMBtu
|
$(-1,642.0) | ||
TOTAL IMPLEMENTED | $40,396 | $23,320 |
$27,161
117,819
kWh
|
$14,877
-
MMBtu
|
$(-1,642.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs