ITAC Assessment: UD0279
ITAC logo
ITAC Assessment: UD0279
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MACHINE KNIVES & WAYS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 107
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,700 3,021,688
kWh
Natural Gas $46,173 11,247
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4151: Minimize water usage $1,243 $300 - - $1,243
03 2.6218: Turn off equipment when not in use $566 - $566
26,084
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,575 $1,333 $1,128
33,998
kWh
$(-272.0)
-
MMBtu
$719
05 2.2414: Use waste heat from hot flue gases to preheat $3,028 $11,000 - $3,028
-
MMBtu
-
06 2.7494: Install storm windows and doors $4,540 $6,900 - $4,540
-
MMBtu
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,008 $1,500 - $2,008
-
MMBtu
-
TOTAL RECOMMENDED $12,960 $21,033 $1,694
60,082
kWh
$9,304
-
MMBtu
$1,962
TOTAL IMPLEMENTED $4,149 $2,833 $1,694
60,082
kWh
$1,736
-
MMBtu
$719
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs