ITAC Assessment: UD0276
ITAC logo
ITAC Assessment: UD0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product AIRCRAFT CARRIER PARTS
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,139 1,291,032
kWh
Natural Gas $12,556 3,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,576 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,433 - $3,733
-
kWh
- $(-300.0)
02 2.4239: Eliminate or reduce compressed air usage $1,143 - $1,387
57,151
kWh
$(-244.0)
-
MMBtu
-
TOTAL RECOMMENDED $4,576 - $5,120
57,151
kWh
$(-244.0)
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs