ITAC Assessment: UD0271
ITAC logo
ITAC Assessment: UD0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PORCELAIN ENAMEL FEEDSTOCK
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,685 4,977,726
kWh
Natural Gas $430,024 138,038
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,942 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,942

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,000 - $4,000
-
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,360 - $1,360
-
kWh
- -
03 2.5194: Redesign process $62,230 $10,000 - $7,230
-
MMBtu
$55,000
04 2.2437: Recover waste heat from equipment $2,591 $500 - $2,591
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,761 $27,100 $13,131
270,809
kWh
- $630
TOTAL RECOMMENDED $83,942 $37,600 $18,491
270,809
kWh
$9,821
-
MMBtu
$55,630
TOTAL IMPLEMENTED $83,942 $37,600 $18,491
270,809
kWh
$9,821
-
MMBtu
$55,630
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs