Assessment Year | 1988 |
---|---|
Principal Product | PORCELAIN ENAMEL FEEDSTOCK |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 88 |
Plant Area |
n/a
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $245,685 | 4,977,726 |
kWh
|
$0.049 |
Natural Gas | $430,024 | 138,038 |
MMBtu
|
$3.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,942 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,942 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,000 | - |
$4,000
-
kWh
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,360 | - |
$1,360
-
kWh
|
- | - | |
03 | 2.5194: Redesign process | $62,230 | $10,000 | - |
$7,230
-
MMBtu
|
$55,000 | |
04 | 2.2437: Recover waste heat from equipment | $2,591 | $500 | - |
$2,591
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,761 | $27,100 |
$13,131
270,809
kWh
|
- | $630 | |
TOTAL RECOMMENDED | $83,942 | $37,600 |
$18,491
270,809
kWh
|
$9,821
-
MMBtu
|
$55,630 | ||
TOTAL IMPLEMENTED | $83,942 | $37,600 |
$18,491
270,809
kWh
|
$9,821
-
MMBtu
|
$55,630 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs