ITAC Assessment: UD0269
ITAC logo
ITAC Assessment: UD0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BABY NURSERY ACCESSORIES
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 238
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,379 959,848
kWh
Natural Gas $21,200 4,923
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,081

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $227 - - $227
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $830 $633 $621
15,826
kWh
$(-129.0)
-
MMBtu
$338
03 2.6212: Turn off equipment during breaks, reduce operating time $242 $500 $242
5,569
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,782 $5,000 $3,638
84,701
kWh
$(-1,856.0)
-
MMBtu
-
TOTAL RECOMMENDED $3,081 $6,133 $4,501
106,096
kWh
$(-1,758.0)
-
MMBtu
$338
TOTAL IMPLEMENTED $3,081 $6,133 $4,501
106,096
kWh
$(-1,758.0)
-
MMBtu
$338
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs