ITAC Assessment: TN0222
ITAC logo
ITAC Assessment: TN0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product FURNITURE
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 4,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,537 4,475,088
kWh
Natural Gas $9,957 2,676
MMBtu
Wood $27,824 63,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $196,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,064

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $171,149 $240,000 $162,240
2,495,897
kWh
$8,909
-
MMBtu
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $8,367 - - $148
-
MMBtu
$8,719
-
MMBtu
$(-500.0)
03 2.2511: Insulate bare equipment $1,224 $1,817 - $22
-
MMBtu
$1,202
-
MMBtu
-
04 2.2163: Use minimum steam operating pressure $687 - - $11
-
MMBtu
$676
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $14,520 $3,000 $14,520
223,329
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $953 $270 $953
14,654
kWh
- - -
TOTAL RECOMMENDED $196,900 $245,087 $177,713
2,733,880
kWh
$9,090
-
MMBtu
$10,597
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $25,064 $5,087 $15,473
237,983
kWh
$170
-
MMBtu
$9,921
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs