Assessment Year | 1984 |
---|---|
Principal Product | FURNITURE |
NAICS |
n/a
|
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 4,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $288,537 | 4,475,088 |
kWh
|
$0.064 |
Natural Gas | $9,957 | 2,676 |
MMBtu
|
$3.72 |
Wood | $27,824 | 63,640 |
MMBtu
|
$0.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $196,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,064 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $171,149 | $240,000 |
$162,240
2,495,897
kWh
|
$8,909
-
MMBtu
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,367 | - | - |
$148
-
MMBtu
|
$8,719
-
MMBtu
|
$(-500.0) | |
03 | 2.2511: Insulate bare equipment | $1,224 | $1,817 | - |
$22
-
MMBtu
|
$1,202
-
MMBtu
|
- | |
04 | 2.2163: Use minimum steam operating pressure | $687 | - | - |
$11
-
MMBtu
|
$676
-
MMBtu
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $14,520 | $3,000 |
$14,520
223,329
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $953 | $270 |
$953
14,654
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $196,900 | $245,087 |
$177,713
2,733,880
kWh
|
$9,090
-
MMBtu
|
$10,597
-
MMBtu
|
$(-500.0) | ||
TOTAL IMPLEMENTED | $25,064 | $5,087 |
$15,473
237,983
kWh
|
$170
-
MMBtu
|
$9,921
-
MMBtu
|
$(-500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Wood Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs