ITAC Assessment: UD0268
ITAC logo
ITAC Assessment: UD0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MANIFOLD BUSINESS FORMS
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $10
M
to 50
M
# of Employees 217
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $274,803 5,876,026
kWh
Natural Gas $47,719 12,887
MMBtu
Fuel Oil #2 $5,400 1,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,113 - - $1,113
-
MMBtu
-
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $3,128 $3,448 $2,722
54,513
kWh
$406
-
MMBtu
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,096 $3,000 $8,335
92,614
kWh
$(-2,239.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $281 - $186
4,396
kWh
$(-53.0)
-
MMBtu
$148
TOTAL RECOMMENDED $10,618 $6,448 $11,243
151,523
kWh
$(-773.0)
-
MMBtu
$148
TOTAL IMPLEMENTED $10,618 $6,448 $11,243
151,523
kWh
$(-773.0)
-
MMBtu
$148
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs