ITAC Assessment: AM0203
ITAC logo
ITAC Assessment: AM0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Room air conditioners, split system type air conditioners
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 410
Plant Area 324,000
ft2
Annual Production 83,319
pieces
Production Hrs. Annual 1,912
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $473,491 8,199,883
kWh
Natural Gas $152,756 48,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7124: Make a practice of turning off lights when not needed $34,315 - $34,315
1,157,093
kWh
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,650 - $14,650
-
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $455 $370 $455
7,620
kWh
04 2.6212: Turn off equipment during breaks, reduce operating time $400 - $400
13,482
kWh
TOTAL RECOMMENDED $49,820 $370 $49,820
1,178,195
kWh
TOTAL IMPLEMENTED $15,105 $370 $15,105
7,620
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs