Assessment Year | 2022 |
---|---|
Principal Product | Industrial Packaging, Automotive Components |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 81 |
Plant Area |
160,000
ft2
|
Annual Production | 1,900,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $522,940 | 5,649,668 |
kWh
|
$0.093 | |
Electricity Demand | $7,032 | 337 |
kW-mo/yr
|
$20.87 | |
Electricity Fees | $339 | - |
|
- | |
Natural Gas | $17,538 | 2,973 |
MMBtu
|
$5.90 | |
Waste Disposal Costs | |||||
Water Usage | $4,071 | 192 |
Tgal
|
$21.26 | |
Water Disposal | $1,354 | 192 |
Tgal
|
$7.07 | |
TOTAL YEARLY COSTS | $553,274 | ||||
RECOMMENDED SAVINGS* | $30,957 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $21,178 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6211: Conserve energy by efficient use of vending machines | $173 | - |
$173
1,857
kWh
|
- | - | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,990 | - | - | - | - | - | $2,990 | |
03 | 2.2211: Use optimum temperature | $2,592 | $14 |
$710
7,634
kWh
|
- | - |
$1,882
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,812 | $52 |
$1,160
227,445
kWh
|
$652
-
kW-mo/yr
|
- | - | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $2,753 | $187 |
$2,753
29,598
kWh
|
- | - | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $3,314 | $467 |
$2,123
41,627
kWh
|
$1,191
-
kW-mo/yr
|
- | - | - | |
07 | 2.5195: Change product design to reduce energy requirements | $780 | $168 |
$499
9,789
kWh
|
$281
-
kW-mo/yr
|
- | - | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $132 | $44 |
$14
275
kWh
|
$118
-
kW-mo/yr
|
- | - | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $2,975 | $1,250 |
$1,335
26,177
kWh
|
$1,640
-
kW-mo/yr
|
- | - | - | |
10 | 2.4239: Eliminate or reduce compressed air usage | $2,434 | $1,250 |
$2,434
26,177
kWh
|
- | - | - | - | |
11 | 2.2211: Use optimum temperature | $837 | $763 |
$837
9,000
kWh
|
- | - | - | - | |
12 | 2.8121: Apply for tax-free status for energy purchases | $7,116 | $8,000 | - | - | $7,116 | - | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $419 | $1,159 |
$419
4,509
kWh
|
- | - | - | - | |
14 | 2.7492: Use proper thickness of insulation on building envelope | $2,629 | $9,543 |
$52
1,028
kWh
|
- | - |
$2,577
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $30,957 | $22,897 |
$12,510
385,116
kWh
|
$3,882
-
kW-mo/yr
|
$7,116 |
$4,459
-
MMBtu
|
$2,990 | ||
TOTAL IMPLEMENTED | $21,178 | $19,279 |
$4,651
284,375
kWh
|
$1,961
-
kW-mo/yr
|
$7,116 |
$4,459
-
MMBtu
|
$2,990 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs