ITAC Assessment: UD0267
ITAC logo
ITAC Assessment: UD0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product INDUSTRIAL KNIVES & WAY BARS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area
n/a
Annual Production 2,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $185,739 3,104,045
kWh
LPG $21,682 2,482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,599 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,349

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,625 - $2,625
-
kWh
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,250 - $5,250
-
kWh
- -
03 2.1332: Convert combustion equipment to burn natural gas $10,439 $4,448 - $(-11,243.0)
-
MMBtu
$21,682
-
MMBtu
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,285 $552 $1,642
16,706
kWh
$(-357.0)
-
MMBtu
-
TOTAL RECOMMENDED $19,599 $5,000 $9,517
16,706
kWh
$(-11,600.0)
-
MMBtu
$21,682
-
MMBtu
TOTAL IMPLEMENTED $14,349 $5,000 $4,267
16,706
kWh
$(-11,600.0)
-
MMBtu
$21,682
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs