ITAC Assessment: MI0218
ITAC logo
ITAC Assessment: MI0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Industrial Organic Chemicals
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area 2,003,760
ft2
Annual Production 36,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,278,779 30,943,249
kWh
Electricity Demand $559,728 47,255
kW-mo/yr
Electricity Fees $106,656 -
Natural Gas $1,603,321 277,341
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $302,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,074

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $78,730 $63,811 $64,540
872,159
kWh
$14,190
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $71,478 $47,240 $58,595
791,822
kWh
$12,883
-
kW-mo/yr
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $53,118 $2,520 - - $53,118
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,712 $21,000 $21,081
284,877
kWh
$4,631
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,901 $1,660 $17,952
242,596
kWh
$3,949
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,917 $6,660 $16,328
220,649
kWh
$3,589
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,529 $8,200 $10,267
138,747
kWh
$2,262
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $10,055 $80 $7,593
102,606
kWh
$2,462
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,885 $13,800 $7,286
98,456
kWh
$1,599
-
kW-mo/yr
-
TOTAL RECOMMENDED $302,325 $164,971 $203,642
2,751,912
kWh
$45,565
-
kW-mo/yr
$53,118
-
MMBtu
TOTAL IMPLEMENTED $85,074 $4,260 $25,545
345,202
kWh
$6,411
-
kW-mo/yr
$53,118
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs