ITAC Assessment: MS0411
ITAC logo
ITAC Assessment: MS0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Electro-coated frames
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 80
Plant Area 150,087
ft2
Annual Production 362,155
units
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,117 5,016,000
kWh
Electricity Demand $60,760 9,799
kW-mo/yr
Electricity Fees $105,897 -
Natural Gas $183,952 29,362
MMBtu
Waste Disposal Costs
Water Usage $31,144 9,330
Tgal
Water Disposal $20,586 9,330
Tgal
TOTAL YEARLY COSTS $658,456
RECOMMENDED SAVINGS* $77,985 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $16,956 $42,807 - $16,956
-
MMBtu
02 2.7135: Install occupancy sensors $113 $335 $113
2,217
kWh
-
03 2.9114: Use solar heat to make electricty $56,198 $786,625 $56,198
1,101,918
kWh
-
04 3.8121: Cover containers to minimize evaporative losses $4,180 $4,512 - $4,180
-
MMBtu
05 2.4133: Use most efficient type of electric motors $537 $3,690 $537
10,529
kWh
-
TOTAL RECOMMENDED $77,985 $837,969 $56,848
1,114,664
kWh
$21,137
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs