Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product APPLIANCE PARTS
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area
n/a
Annual Production 13,000,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,116 97,011
kWh
Natural Gas $773 158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $182 - $219
3,810
kWh
$(-37.0)
-
MMBtu
-
02 2.3191: Use demand controller or load shedder $680 - $680
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $168 $64 $216
3,810
kWh
$(-37.0)
-
MMBtu
$(-11.0)
TOTAL RECOMMENDED $1,030 $64 $1,115
7,620
kWh
$(-74.0)
-
MMBtu
$(-11.0)
TOTAL IMPLEMENTED $350 $64 $435
7,620
kWh
$(-74.0)
-
MMBtu
$(-11.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs