ITAC Assessment: AS0277
ITAC logo
ITAC Assessment: AS0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic Products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,930 3,558,910
kWh
Electricity Demand $30,082 6,768
kW-mo/yr
Electricity Fees $14,156 -
Natural Gas $1,569 150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,450 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,580 $220 $8,421
163,247
kWh
$1,159
-
kW-mo/yr
- - - -
02 2.4133: Use most efficient type of electric motors $4,074 $7,709 $3,582
69,461
kWh
$492
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,336 $5,790 $2,900
55,979
kWh
$436
-
kW-mo/yr
- - - -
04 3.5217: Reuse / recycle/ sell paper products $864 $60 - - - - $(-216.0) $1,080
05 4.212: Adopt in-house material generation $71,251 $9,660 $(-7,949.0)
(-230,363)
kWh
- $103,200
-
lb
$(-24,000.0) - -
06 4.454: Modify startup/shutdown times $1,239 $120 - - - - $1,239 -
07 4.812: Apply for investment incentives $2,106 $60 - - - - $2,106 -
TOTAL RECOMMENDED $92,450 $23,619 $6,954
58,324
kWh
$2,087
-
kW-mo/yr
$103,200
-
lb
$(-24,000.0) $3,129 $1,080
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs