ITAC Assessment: UD0254
ITAC logo
ITAC Assessment: UD0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MACHINERY, RENDERING INDUSTRY
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 153
Plant Area
n/a
Annual Production 250
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,913 2,395,955
kWh
Natural Gas $41,054 9,135
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $24,969 $45,557 $24,464
415,006
kWh
$(-1,053.0)
-
MMBtu
$1,558
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,916 $2,000 $4,837
53,927
kWh
$(-921.0)
-
MMBtu
-
03 2.7231: Use radiant heater for spot heating $8,595 $15,000 - $8,595
-
MMBtu
-
TOTAL RECOMMENDED $37,480 $62,557 $29,301
468,933
kWh
$6,621
-
MMBtu
$1,558
TOTAL IMPLEMENTED $33,564 $60,557 $24,464
415,006
kWh
$7,542
-
MMBtu
$1,558
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs