ITAC Assessment: UD0253
ITAC logo
ITAC Assessment: UD0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CORRUGATED PAPER PCKGING
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area
n/a
Annual Production 22,000
ton
Production Hrs. Annual 4,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,416 2,167,057
kWh
Natural Gas $96,892 27,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,052 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,052

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7314: Reduce ventilation air $2,007 $900 $617
11,137
kWh
$1,390
-
MMBtu
-
02 3.4157: Replace water cooling on processes with air cooling $15,536 $20,000 $2,245
20,809
kWh
$886
-
MMBtu
$12,405
03 2.2511: Insulate bare equipment $875 $805 - $875
-
MMBtu
-
04 2.2414: Use waste heat from hot flue gases to preheat $4,830 $8,000 - $4,830
-
MMBtu
-
05 2.7494: Install storm windows and doors $804 $700 - $804
-
MMBtu
-
TOTAL RECOMMENDED $24,052 $30,405 $2,862
31,946
kWh
$8,785
-
MMBtu
$12,405
TOTAL IMPLEMENTED $24,052 $30,405 $2,862
31,946
kWh
$8,785
-
MMBtu
$12,405
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs