ITAC Assessment: MA0097
ITAC logo
ITAC Assessment: MA0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CUTLERY, TRADE TOOLS
NAICS
n/a
SIC 3421: Cutlery
Sales Range $1
M
to 5
M
# of Employees 84
Plant Area
n/a
Annual Production 1,000,000
pieces
Production Hrs. Annual 1,975
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,234 1,192,263
kWh
Fuel Oil #2 $51,114 11,927
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,919 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $108 $86 $108
2,345
kWh
-
02 2.3512: De-energize excess transformer capacity $3,263 $12,000 $3,263
70,633
kWh
-
03 2.2511: Insulate bare equipment $922 $876 $922
19,930
kWh
-
04 2.2511: Insulate bare equipment $1,086 $851 - $1,086
-
MMBtu
05 2.6212: Turn off equipment during breaks, reduce operating time $1,363 $5,500 $1,363
29,601
kWh
-
06 2.4133: Use most efficient type of electric motors $349 $2,167 $349
7,620
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,283 - $1,283
27,843
kWh
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,545 $6,000 $1,545
33,411
kWh
-
TOTAL RECOMMENDED $9,919 $27,480 $8,833
191,383
kWh
$1,086
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs