Assessment Year | 1988 |
---|---|
Principal Product | POWER SYSTEMS |
NAICS |
n/a
|
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 700
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $116,798 | 1,818,875 |
kWh
|
$0.064 |
Natural Gas | $4,749 | 839 |
MMBtu
|
$5.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,103 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $9,500 | $15,000 |
$10,332
-
kWh
|
- | $(-832.0) | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,275 | - |
$7,275
-
kWh
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,853 | $16,000 |
$5,407
62,134
kWh
|
$(-1,554.0)
-
MMBtu
|
- | |
04 | 2.5194: Redesign process | $2,282 | $1,500 |
$2,454
27,550
kWh
|
$(-172.0)
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $882 | $300 |
$922
12,603
kWh
|
$(-40.0)
-
MMBtu
|
- | |
06 | 2.6224: Schedule baking times of small and large components | $311 | $500 |
$311
4,982
kWh
|
- | - | |
TOTAL RECOMMENDED | $24,103 | $33,300 |
$26,701
107,269
kWh
|
$(-1,766.0)
-
MMBtu
|
$(-832.0) | ||
TOTAL IMPLEMENTED | $17,657 | $15,300 |
$18,529
12,603
kWh
|
$(-40.0)
-
MMBtu
|
$(-832.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs