Assessment Year | 2012 |
---|---|
Principal Product | Aircraft fuel cells |
NAICS | 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing |
SIC | 3629: Electrical Industrial Apparatus, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
450,000
ft2
|
Annual Production | 3,300
pieces
|
Production Hrs. Annual | 3,300
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $424,014 | 5,289,966 |
kWh
|
$0.080 |
Electricity Demand | $109,852 | 18,746 |
kW-mo/yr
|
$5.86 |
Natural Gas | $387,222 | 63,559 |
MMBtu
|
$6.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,486 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $17,497 | $27,016 | - | - |
$17,497
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $50,910 | $106,879 |
$40,218
501,784
kWh
|
$10,692
-
kW-mo/yr
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,061 | $38,900 |
$19,797
247,000
kWh
|
$5,263
-
kW-mo/yr
|
- | - | - | |
04 | 2.2514: Cover open tanks | $1,576 | - | - | - |
$1,576
-
MMBtu
|
- | - | |
05 | 2.1241: Reduce excessive boiler blowdown | $13,280 | $31,040 | - | - |
$6,820
-
MMBtu
|
$2,280
-
Tgal
|
$4,180
-
gal
|
|
06 | 2.2136: Install / repair insulation on steam lines | $4,630 | $4,000 | - | - |
$4,630
-
MMBtu
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $20,532 | $9,400 | - | - |
$20,532
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $133,486 | $217,235 |
$60,015
748,784
kWh
|
$15,956
-
kW-mo/yr
|
$51,055
-
MMBtu
|
$2,280
-
Tgal
|
$4,180
-
gal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs