ITAC Assessment: UD0239
ITAC logo
ITAC Assessment: UD0239
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MEAT PROCESSING
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,100
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,907 3,766,120
kWh
Natural Gas $154,734 32,192
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,627 $2,500 $2,627
95,252
kWh
- -
02 2.5121: Redesign flow to minimize mass transfer length $23,356 $10,000 - $20,448
-
MMBtu
$2,908
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,341 $600 $693
14,947
kWh
- $648
04 2.2414: Use waste heat from hot flue gases to preheat $5,069 $6,000 - $5,069
-
MMBtu
-
TOTAL RECOMMENDED $32,393 $19,100 $3,320
110,199
kWh
$25,517
-
MMBtu
$3,556
TOTAL IMPLEMENTED $32,393 $19,100 $3,320
110,199
kWh
$25,517
-
MMBtu
$3,556
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs