ITAC Assessment: UD0228
ITAC logo
ITAC Assessment: UD0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MEDICAL & XRAY EQUIPMENT
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 371
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,918 2,767,585
kWh
Natural Gas $53,867 10,847
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,496 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,762

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $8,352 $13,000 - $8,352
-
MMBtu
02 2.5194: Redesign process $734 $200 $10
293
kWh
$724
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $410 $50 $529
9,379
kWh
$(-119.0)
-
MMBtu
TOTAL RECOMMENDED $9,496 $13,250 $539
9,672
kWh
$8,957
-
MMBtu
TOTAL IMPLEMENTED $8,762 $13,050 $529
9,379
kWh
$8,233
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs