ITAC Assessment: UD0227
ITAC logo
ITAC Assessment: UD0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product WELDING WIRES & FLUXES
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 3,600,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $369,892 5,623,095
kWh
Natural Gas $54,667 10,639
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,278 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $26,035 $30,000 $32,616
577,081
kWh
$(-6,581.0)
-
MMBtu
-
02 2.3212: Optimize plant power factor $4,712 $12,000 $4,712
-
kWh
- -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,245 - $1,844
53,634
kWh
$(-599.0)
-
MMBtu
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $534 $6,000 $422
12,309
kWh
- $112
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,752 - $7,152
-
kWh
- $(-1,400.0)
TOTAL RECOMMENDED $38,278 $48,000 $46,746
643,024
kWh
$(-7,180.0)
-
MMBtu
$(-1,288.0)
TOTAL IMPLEMENTED $31,281 $48,000 $37,750
589,390
kWh
$(-6,581.0)
-
MMBtu
$112
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs