Assessment Year | 2000 |
---|---|
Principal Product | Internals for Pacemakers |
NAICS |
n/a
|
SIC | 3845: Electromedical and Electrotherapeutic Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
60,000
ft2
|
Annual Production | 144,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $407,441 | 7,381,888 |
kWh
|
$0.055 |
Electricity Demand | $20,126 | 11,706 |
kW-mo/yr
|
$1.72 |
Electricity Fees | $25,253 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $307,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,266 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7131: Add area lighting switches | $3,618 | $2,270 |
$3,618
77,081
kWh
|
- | - | - | - | - | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $959 | $120 |
$959
20,516
kWh
|
- | - | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $697 | $536 |
$514
11,137
kWh
|
$183
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,563 | $60 |
$1,563
33,411
kWh
|
- | - | - | - | - | |
05 | 2.4314: Use synthetic lubricant | $1,793 | $694 |
$620
13,189
kWh
|
$248
-
kW-mo/yr
|
$493
-
gal
|
- | - | $432 | |
06 | 2.4133: Use most efficient type of electric motors | $2,843 | $4,974 |
$2,284
48,652
kWh
|
$559
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.6192: Use a less expensive method of waste removal | $2,580 | $120 | - | - | - | - | $2,580 | - | |
08 | 3.6192: Use a less expensive method of waste removal | $624 | $60 | - | - | - | - | $624 | - | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $292,414 | $1,000,000 |
$3,301
70,340
kWh
|
$(-2,087.0)
-
kW-mo/yr
|
- | $291,200 | - | - | |
TOTAL RECOMMENDED | $307,091 | $1,008,834 |
$12,859
274,326
kWh
|
$(-1,097.0)
-
kW-mo/yr
|
$493
-
gal
|
$291,200 | $3,204 | $432 | ||
TOTAL IMPLEMENTED | $9,266 | $5,870 |
$5,320
113,716
kWh
|
$742
-
kW-mo/yr
|
- | - | $3,204 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs