ITAC Assessment: UD0226
ITAC logo
ITAC Assessment: UD0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PAPER CONVERTING PRODCTS
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 4,500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,181 1,919,695
kWh
Natural Gas $264,815 56,751
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,163

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7492: Use proper thickness of insulation on building envelope $2,972 $2,565 - $2,972
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $18,458 $30,000 - $18,458
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,151 $1,232 $2,480
38,980
kWh
$(-305.0)
-
MMBtu
$976
04 2.4322: Use or replace with energy efficient substitutes $11,040 $24,000 - $11,040
-
MMBtu
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,236 - $7,236
-
kWh
- -
TOTAL RECOMMENDED $42,857 $57,797 $9,716
38,980
kWh
$32,165
-
MMBtu
$976
TOTAL IMPLEMENTED $17,163 $27,797 $2,480
38,980
kWh
$13,707
-
MMBtu
$976
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs