ITAC Assessment: UD0225
ITAC logo
ITAC Assessment: UD0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AUTO SAFETY & LIGHTING
NAICS
n/a
SIC 3647: Vehicular Lighting Equipment
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 2,032
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,702 1,421,454
kWh
Natural Gas $89,342 17,649
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,297

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $2,781 $2,200 $2,781
-
kWh
- -
02 2.2449: Recover heat from exhausted steam, hot air or hot water $1,298 $1,000 - $259
-
MMBtu
$1,039
03 2.7494: Install storm windows and doors $2,611 $2,160 - $2,611
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $228 $360 - $228
-
MMBtu
-
05 2.2414: Use waste heat from hot flue gases to preheat $4,248 $6,000 - $4,248
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,131 $14,688 $7,414
109,027
kWh
$(-1,488.0)
-
MMBtu
$2,205
TOTAL RECOMMENDED $19,297 $26,408 $10,195
109,027
kWh
$5,858
-
MMBtu
$3,244
TOTAL IMPLEMENTED $19,297 $26,408 $10,195
109,027
kWh
$5,858
-
MMBtu
$3,244
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs