ITAC Assessment: UD0218
ITAC logo
ITAC Assessment: UD0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product BALL BEARING ASSEMBLIES
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 24,000,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,807 3,240,914
kWh
Natural Gas $36,913 7,757
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $19,049 $5,470 $18,408
279,308
kWh
- $641
02 2.2437: Recover waste heat from equipment $3,039 $9,500 - $3,039
-
MMBtu
-
03 2.6218: Turn off equipment when not in use $463 $129 $119
2,638
kWh
$344
-
MMBtu
-
04 2.3191: Use demand controller or load shedder $11,481 - $5,865
-
kWh
$5,616
-
MMBtu
-
TOTAL RECOMMENDED $34,032 $15,099 $24,392
281,946
kWh
$8,999
-
MMBtu
$641
TOTAL IMPLEMENTED $30,530 $5,470 $24,273
279,308
kWh
$5,616
-
MMBtu
$641
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs