ITAC Assessment: UD0217
ITAC logo
ITAC Assessment: UD0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product REINFORCED ELECTRICAL GRATES
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 256
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,707 3,740,914
kWh
Natural Gas $134,541 28,404
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,975

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $6,538 $5,000 $6,538
-
MMBtu
02 2.7421: Reduce glazed areas in buildings $3,993 $20,000 $3,993
-
MMBtu
03 2.2437: Recover waste heat from equipment $5,444 $1,000 $5,444
-
MMBtu
04 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $20,387 $50,000 $20,387
-
MMBtu
TOTAL RECOMMENDED $36,362 $76,000 $36,362
-
MMBtu
TOTAL IMPLEMENTED $15,975 $26,000 $15,975
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs