Assessment Year | 1986 |
---|---|
Principal Product | ALUMINUM CASTINGS |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $5 M to 10M |
# of Employees | 33 |
Plant Area |
n/a
|
Annual Production | 600
ton
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $148,263 | 2,541,032 |
kWh
|
$0.058 |
LPG | $10,245 | 2,346 |
MMBtu
|
$4.37 |
Fuel Oil #2 | $1,740 | 305 |
MMBtu
|
$5.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,041 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,154 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $6,963 | $3,000 |
$6,963
-
kWh
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,230 | $800 |
$1,644
22,567
kWh
|
$(-414.0)
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,924 | $910 |
$2,278
38,687
kWh
|
$(-354.0)
-
MMBtu
|
|
04 | 2.2514: Cover open tanks | $1,924 | $400 | - |
$1,924
-
MMBtu
|
|
TOTAL RECOMMENDED | $12,041 | $5,110 |
$10,885
61,254
kWh
|
$1,156
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,154 | $1,710 |
$3,922
61,254
kWh
|
$(-768.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs